3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener

Product Details
Customization: Available
Max.Head: 50-80m
Max.Capacity: >400 L/min

360° Virtual Tour

Diamond Member Since 2013

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000, ISO 14001
OEM/ODM Availability
Yes
  • 3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener
  • 3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener
  • 3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener
  • 3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener
  • 3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener
  • 3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener
Find Similar Products

Basic Info.

Model NO.
3 X 2 C-NP
Impeller Number
Single-Stage Pump
Working Pressure
High Pressure Pump
Influent Type of Impeller
Single Suction Pump
Position of Pump Shaft
Horizontal Pump
Pump Casing Combined
Horizontal Split Pumps
Mounting Height
Suction Centrifugal
Impeller
Open
Usage
Pump, Pumps, Condensate Pump, Slurry Pump, Circulating Pump
Product Name
Coal Mining Solid Handling Slurry Pumps
Wet End Parts
High Chrome Alloy
Size
2′′x3′′
Drive Type
CV/Dcz/Zvz/Crz
Seal Type
Packing Gland/Expeller/Mechanical Seal
Transport Package
Wooden Case
Specification
3/2C
Trademark
Naipu
Origin
China
HS Code
8413701090
Production Capacity
500sets/Month

Product Description

3X2 C - NP A49 Slurry Pump to Tailing Pond from Tailing Thickener

Naipu NP-A H(R) series centrifugal slurry pumps and spare parts can fully interchangeable with world famous brand. These pumps are of heavy duty construction, designed for continous pumping of highly abrasive and corrosive slurries. They feature a wide choice of replaceable abrasion resistant metal or molded elastomer casting liners and impellers, which are all interchangeable within a common casting assembly.

Typical Application-
Mineral Flotation Processing
Electric Factory Coal preparation
Coal Washing
Chemical medium processing
Sand and gravel handling
Effluent Handling

Construction Drawing

3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener
3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener
3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener


3/2 C- NP   Main Parts List
 
3/2C-NP  Shaft Sleeve C075
Base  C003M
Lantern Ring C063
Lantern Restrictor C118
Packing Seal C067
Frame Plate  C2032
Cover Plate C2013
Impeller  C2147
Volute C2110NA
Frame Plate Liner Insert  C2041
Shaft Spacer C117
Stuffing Box C078
Expeller  C028
Expeller Ring  C029
Suction Gasket  C2060
Discharge Gasket C2132XLP
Volute Liner Seal C2125
Seal Ring C122
Labyrinth Ring C108
Oil Cup Base D138
Bearing Housing C004M
End Cover C024
Grease Retainer C046
Labyrinth Sleeve C062
Shaft  C073M
Bearing Assembly C005M




Product Overview:

For the AH pump types,we can provide as below,
1.5/1B-A H(R)  2/1.5B-A H(R) 3/2C-A H(R) 4/3C-A H(R) 6/4D-A H(R) 6/4E-A H(R) 8/6E-A H(R)
8/6R-A H(R)  10/8F-A H(R)  10/8ST-A H(R)  12/10ST-A H(R)  12/10FF-A H(R)  14/12G-A H(R)
14/12ST-A H(R)  16/14TU-A H(R)  20/18TU-A H(R)

3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener






Our Workshop Show:
Naipu Pump has Mould workshop,Casting Workshop,Machining Workshop,Heat Treatment Workshop,Assembly Workshop,Test Workshop etc.

3X2 C - Np A49 Slurry Pump to Tailing Pond From Tailing Thickener




Possible Faults and Settlements 
 
        Faults      Reason        Settlement
1.Pump fails to discharge any water,The hand of pressure gauge beat violently  1.Suction pipe don't have enough water.
2.Suction pipe blocked or the valve is locked.
1. Inject enough water
2.unlock the inlet valve,clear the blocks
3.Exclude the air leakage 
2.The pump can't discharge water,the hand of vacuum meter beat heavily.  1.The inlet valve is unlocked or silted up.
2.The resistance of suction pipe is too big or silted up.
3.The height of suction is too high. 
1.Unlock the valve or desilting 
2.improve the design of  suction pipe or desilt 
3.Lower the height of the installation.
3.The pump can't discharge water,pressure gauge shows heavy pressure. 1.The resistance of the discharge pipe is too big.
2.The impeller blocked
3.The speed is slow.
1.Check and adjust the outlet pipe.
2.Clear the impeller
3. Improve the speed.
4.The pump doesn't rotate  The volute is silted up by the blocks.  Clear the blocks
5.The capacity is not enough  1.The blocks of the impeller or the inlet or outlet pipe.
2.The abrasion of the impeller is heavily.
3.The speed is low to normal 
4.Pump is installed unreasonably or the leakage of the inlet pipe.
5.The transporting height is too high,the loss of the resistance of the inside pipe are too big.
6.The inlet valve not open enough or blocked
7.The packing seal leaks
1.Clear the impeller or pipe.
2.Change the impeller


3.Adjust the speed
4.Install again or stop leaking.

 
  1. Decrease the height of the transport or reduce the resistance.
  2. Unlock the inlet valve
 
  1. Compress the packing tightly
6.The motor of the pump is overloaded  1.The head of the pump exceeds the head of the working condition.
2.Not consider the slurry density when selecting the pump.
3.The packing press tightly
1.Turn down the outlet valve,cut the impeller or lower the speed.
2.Select the motor again.
3.Adjust the the screw of the  packing gland 
7.Abnormal sound in the pump, and no water out 1.The resistance of the inlet pipe is too big.
2.The height of the suction is too high.
3.Cavitation occurred 
  1. there is air in the inlet
  2. The temperature of the liquid is too high
  1. Clear the suction pipe and sluice valve.
  2. Lower the height of the suction 
  3. Adjust the water valve and let the pump operate in the defined limits.
  4. Block the leakage.
  5. Lowering the liquid temperature.
8.pump vibrates 1.pump cavitate 
2.The block of the impeller single vane 
3.The no concentricity  between the pump shaft and motor shaft
4.Fasteners or foundation loose
1.Adjust the water valve ,lower the height of the installation,reduce the resistance of the inlet.
2.Clear the impeller
3.Alignment again
4.Fasten the screw,and reinforce the foundation.
9.Bearing is overheat  1.lock the cooling water
2.lubrication is not good.
3.the lubrication oil is not clear
4.the wrong direction of the thrust bearing.
5.there is something wrong with the bearing.
  1. Open the cooling water
  2. Adjust the oil quantity 
  3. Clear the shaft,change oil
  4. According to the inlet pressure,adjust the direction of the thrust bearing.
  5. Change the bearing 
10.Packing short life  The material of packing is not good  Change the packing 
11.pump leak oil 1.High oil level
2.The rubber parts invalid  
3.Assembly problem
1.Lower the oil level
2.Change rubber spares
3.Adjust the assembly
 
12 Pump head leaking  1.The rubber parts not press well Assembly again or press tightly 


Applications

Heavy Mining | Mineral Processing | Sand and Gravel |Coal Prep | Cyclone Feeds | Aggregate Processing | Fine Primary Mill Grinding | Chemical Slurry Service | Tailings | Secondary Grinding | Industrial Processing | Pulp And Paper | Food Processing | Cracking Operations | Ash Handling | Pipeline Transport | High Velocity Hydraulic Transport |Food Processing | Explosive Sludge In Metal Smelting | River And Pond Dredging | Heavy Refuse Removal | Larger Particle Or Low NPSHA Applications | Continuous (Snore) Sump Pump Operation | Abrasive Slurries | High Density Slurries | Large Particle Slurries | Sump Drainage | Wash down | Floor Drainage | Mixing | Iron Ore | Cooper | Diamond | Alumina | Coal | Gold | Kaolin | Phosphorite | Steel | Palm | Suger | Chemical | Power | FGD | Frac Sand Blending | Construction | City Sewage | etc. 


Contact Us 

Contact Person: Karen Tan  


 




 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier